Sunday, July 15, 2007

Slowly removing each of the roadblocks

Bit by bit I'm getting each of the million little tasks out of the way that are part of the remodel on the first floor. This weekend, I got the underlayment in the bathroom finished. At this point there is a total of 2 inches of plywood covering the joists in the bathroom. Why so much? Well, the floors are so uneven in this house that there was a 3/4 inch difference between the living room and the bathroom. That leaves the following things:
  • Hang bathroom door
  • Rewiring of the spaghetti mess that goes into the three breaker boxes in our basement.
  • Rough wiring for the bathroom, kitchen, laundry and new fixtures in the dining room
  • Rough plumbing in the bathroom, kitchen and laundry
  • Hang drywall
  • Finish drywall
  • Install new windows
  • Install trim
  • Install cabinets
  • Install dish washer
  • Install counter tops
  • Finish plumbing
  • Finish electrical
  • Paint
  • Install hardwoods
I'm going to try and do the things in red. Well, that's it for now.